| TE1ACC002 cavity history | Last updated: | 2009-04-01 | |||||
| Date | Activity | Notes | |||||
| Order | Link to Vendor data | ||||||
| Niobium QA | Link to ECS | look for 4/1/2008 data | |||||
| Fabrication | |||||||
| 2009-01-14 | QA | Inner surface inspection | by Ge, Wu | ||||
| 2009-01-29 | EP 112 micron | Kelly, Gerbick, Bice, Wu | |||||
| 60 soap US + DI hand rinsing | Bice | ||||||
| 2009-01-30 | HPR 60 minutes | Bice, Olis | |||||
| HPR 110 minutes | Bice, Olis | ||||||
| 2009-02-02 | Final Assembly | Bice | |||||
| Pumpdown | Bice, Montiel, Rowe, Wu | ||||||
| 2009-02-03 | leak check | Bice, Wu | |||||
| 2009-02-04 | RF test | Ozelis | |||||
| 2009-02-09 | Back fill and disconnect | ||||||
| 2009-02-13 | Ethanol rinsing 10min | No US afterwards | |||||
| HPR 110 minutes? | |||||||
| 2009-02-17 | Final Assembly, pumpdown | ||||||
| 2009-02-18 | Leak check passed | ||||||
| Cavity hookup to test stand | |||||||
| T-map installed | |||||||
| 2009-02-19 | Dewar prefill | ||||||
| 2009-02-20 | RF test 2 | 31.5 MV/m, strong q-slope, no x-ray | |||||
| 2009-03-03 | 120 C in-situ baking | ||||||
| 2009-03-17 | RF test 3 | 37 MV/m, limited by quench | |||||
| 2009-03-31 | RF test 4 | 34.6 MV/m, limited by quench | |||||
|
|||||||