Agenda by Nelson Chester
The Agenda of the meeting is as follows: Primary Respons.
1. Status of Panel Skin order DE, RE
Skin Order ready to go out, slight problems
on the sole sourcing" will be
solved at L2 (Dan Green).
2.
Status of Panel Specification and Panel
Order
NC, DE
A. Plans for Teleconference with UF
Technical Specs ready to be discussed with
Gena and Andrei.
Video Meeting On Thirsday, Aug. 6th at 9:30.
B. Planned trip to Plascore
When and who is going?
Nelson Chester, Dave Eartly, Greg Kablinska
and Nelson Sample will go to PLASCORE by Aug. 20th to discuss their QC/QA
system and the options available to optimize the panel cost.
3.
Lab 8 Setup and Production Readiness;
Panel Lifting and Handling Equiment YP
Yuri described a floor plan for the production in Lab 8. He will also explore the "vacuum lifter" to pick-up panels. Some of these lifters have been used at FNAL, and he will contact the appropriate people to see if they can be re-used. He will also be in contact with Great Lakes, a company the provide vacuum lifters. PPD will probably assume responsability for these lifters, and that has to be agreed on a MOU. He mentioned a 6k$ laser-head for the Axxion machine that could allow us to make quick scans for the tickness measurement of the panels.
4.
MP-9 Building readiness and CMS occupancy
A. Schedule for moving in
GS
B. Setup Plans
All
C. Setup of Budget Code
DE
D. Office Area Update
NC
The SOW for MP9 occupancy has been setup. Dave claims the Wire Winding machine will be ready after September 8th. A trailer will be used to provide office space.
5.
Status of Cosmic Test Stand Design and
Lab 7 space.
YP
The design of the cosmic ray setup is
converging. Pending final safety review, it will be realeased to UF and
UCLA. From a private discussion with Andrei, the respective universities
will procure and assemble the cosmic stands.
6.
Status of Preproduction Large Chamber
DE
A. Axxiom and Gerber work Done?
B. Panel Gluing, Winding, etc
C. Manufacturing Plan, Labs 6, 7 vs.
MP-9.
Action Item
Dave and Oleg will start writing a plan for
PP2 production. Oleg will discuss it next week.
7.
Panel Cleaning- Current developments and needs DE
Is space available in Lab 8?
Action Item
A lot of discussion is going on for
the panels cleaning issue. Oleg appears to be the only person where
knowledge is stored ! He will report on it next week. There are a number
of basic R&D issues to address; following are some of them:
8. FY1999 Budget
No discussion, really.
9.
Status of ME 2/1 PNPI PreProduction Model
DE, OP
A. Design
B. Parts
C. Production Status
No discussion, really.
10. Misc. and new items. All